Power Wiring Continued - Chamberlain LiftMaster Elite CSL24VH Installation Manual

Liftmaster elite series vehicular slide gate operator
Hide thumbs Also See for LiftMaster Elite CSL24VH:
Table of Contents

Advertisement

WIRING

POWER WIRING CONTINUED...

SOLAR PANEL(S)
NOT PROVIDED. SEE ACCESSORIES.
Solar Application requirements:
• A minimum of four 10W solar panels (Model SOLPNL10W12V). Configuration of
two sets of two 10W paralleled panels put in series.
• A maximum of six 10W solar panels (Model SOLPNL10W12V). Configuration of
three sets of two 10W paralleled panels put in series.
• Solar Battery Harness (Model K94-36596).
• Two 33AH batteries, the standard 7AH batteries cannot be used.
• A heater cannot be used with a solar application.
For solar applications DO NOT use the expansion board and the wireless
dual gate feature. These features will substantially decrease the cycle
rate and standby time of the operator. We recommend LiftMaster low power
draw accessories to minimize power draw, refer to accessory page.
The solar panel(s) must be located in an open area clear of obstructions and shading
for the entire day. The gate operator is not supported in northern climates where
temperatures reach below -4˚F. This is due to cold weather and a reduced number of
hours of sunlight during the winter months. Cycle rate may vary from solar chart for
areas that reach below 32˚F. Solar panels should be cleaned on a regular basis for
best performance to ensure proper operation.
NOTE: Input solar power is 24 Vdc at 60 watts maximum.
1
Locate the J15 plug on the control board and unplug it from the control board
(it will not be used).
2
Set the new 33AH batteries in the operator.
3
Connect the white jumper between the positive (+) terminal of one battery to
the negative terminal (-) of the other battery.
4
Route the battery wires (the longer set of wires) from the J15 plug (new wire
harness) through the back of the electrical box. Connect the red wire to the
positive (+) terminal of one battery. Connect the black wire to the negative (-)
terminal of the other battery.
5
Connect the red wire (+) from one solar panel to the black wire (-) of the other
solar panel.
6
Connect the shorter red wire (+) from the J15 plug (new wire harness) labeled
DC Power to the red wire on one solar panel. Connect the shorter black (-) wire
from the J15 plug (new wire harness) labeled DC Power to the black wire from
the other solar panel.
7
Plug the J15 plug (new wire harness) into the J15 input on the control board.
NOTE: You may see a small spark when plugging the J15 plug into the board.
Proceed to the Dual Gate section (if applicable) or proceed to the Adjustment section.
NUMBER OF CYCLES PER DAY (SOLAR)
Slide Gate Installation
ACCESSORY
(16 ft. 1000 lb. gate)
POWER
DRAW (mA)
40W SOLAR PANEL
60W SOLAR PANEL
3
NOT AVAILABLE
2
1
J15 Plug
(new wire harness,
Model K94-36596)
+
+
40W Solar panel
installation
16
POWER WIRING
ZONE 1
ZONE 2
(6 Hrs
(4 Hrs
sunlight/day)
sunlight/day)
33AH Batteries
33AH Batteries
Required (2)
Required (2)
0
147
85
50
118
58
100
89
34
300
N/A
N/A
500
N/A
N/A
0
239
140
50
206
111
100
174
83
300
59
N/A
500
N/A
N/A
3
2
Black Wire (-)
Black Wire (-)
+
+
Red Wire (+)
60W Solar panel
installation
ZONE 3
(2 Hrs
sunlight/day)
33AH Batteries
Required (2)
30
N/A
N/A
N/A
N/A
54
29
N/A
N/A
N/A
NOT AVAILABLE
1
33AH Batteries
+
+
Red Wire (+)
+
+

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftmaster elite csl24v

Table of Contents