Unpacking The Boiler - Thermal Solutions EVS SERIES Installation, Operating And Service Instructions

Evs series modulating boiler
Table of Contents

Advertisement

a. Direct communication with outdoors. Minimum
free area of 1 square inch per 4,000 Btu per hour
input of all equipment in space.
b. Vertical ducts. Minimum free area of 1 square
inch per 4,000 Btu per hour input of all
equipment in space. Duct cross-sectional area
shall be same as opening free area.
c. Horizontal ducts. Minimum free area of 1
square inch per 2,000 Btu per hour input of all
equipment in space. Duct cross-sectional area
shall be same as opening free area.
Alternate method for boiler located within confined
space. Use indoor air if two permanent openings
communicate directly with additional space(s) of
sufficient volume such that combined volume of all
spaces meet criteria for unconfined space. Size each
opening for minimum free area of 1 square inch per
1,000 Btu per hour input of all equipment in spaces,
but not less than 100 square inches.
7. Ventilation Duct Louvers and Grilles. Equip outside
openings with louvers to prevent entrance of rain
and snow, and screens to prevent entrance of insects
and rodents. Louvers and grilles must be fixed in
open position or interlocked with equipment to open
automatically before burner operation. Screens must
not be smaller than ¼ inch mesh.
II. Unpacking the Boiler
NOTICE
Boiler crate is equipped with a tip and tell label. If
label indicates boiler has been tipped over during
shipping, remove crate and inspect before trucker
leaves.
CAUTION
Do not drop boiler. Do not bump boiler jacket
against floor.
A
. Move boiler to approximate installed position.
B.
Remove all crate fasteners.
C.
Open outside container and remove all inside protective
spacers and bracing.
D.
Remove all boiler hold-down fasteners.
Consider the blocking effect of louvers, grilles and
screens when calculating the opening size to provide
the required free area. If free area of louver or grille
is not known, assume wood louvers have 20-25
percent free area and metal louvers and grilles have
60-75 percent free area.
Do not install boiler where gasoline or other
flammable vapors or liquids, or sources of
hydrocarbons (i.e. bleaches, cleaners, chemicals,
sprays, paint removers, fabric softeners, etc.) are
used or stored.
Due to the low water content of the boiler, incorrect
sizing of the boiler with regard to the heating
system load will result in excessive boiler cycling
and accelerated component failure. Thermal
Solutions DOES NOT warrant failures caused
by incorrectly sized boiler applications. DO NOT
oversize the boiler to the system. Modular boilers
greatly reduce the likelihood of boiler oversizing.
Installation of this boiler should be undertaken
only by trained and skilled personnel from a
qualified service agency.
E.
Remove unit from shipping skid (if provided).
.
1
Tilt the boiler to one side and slide a small roller
under the raised base.
2. Tilt the boiler to the other side and slide another
roller under the base.
3. Place a larger pipe roller on floor behind the skid.
4. Roll the boiler forward or backward off the skid and
onto the pipe roller.
F.
Move boiler to its permanent location.
10
DANGER
NOTICE
WARNING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents