Thermal Solutions EVS SERIES Installation, Operating And Service Instructions page 68

Evs series modulating boiler
Table of Contents

Advertisement

Figure 22e: DB&B w/POC Gas Train (1000-2000)
Key
Description
No.
3. MAIN AND PILOT GAS TRAIN
Main Gas Valve Body, DBL,
3A
1-1/2" NPT
Manual Gas Valve with Pilot
3B
Tapping, 1-1/2" NPT
DB&B w/POC Actuator/
3C
Regulator Ratio Valve,
Siemens SKP75 (max 5 PSI)
DB&B w/POC Actuator,
3D
Siemens SKP15
3E
Manual Gas Cock, 1/4"
3F
Pilot Gas Regulator
3G
High Gas Pressure Switch
3H
Low Gas Pressure Switch
3I
Normally Open Vent Valve
DB&B W/POC – MAIN AND PILOT
EVS-1000
68
EVS-1500
EVS-2000
(1)
81663404
(2)
806603053
(1)
81663409
(1)
81663407
(3)
822758
(1)
822702
(1)
80160333
(1)
80160332
(1)
81660748

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents