Daikin RZQG71~140L7V1B Service Manual page 164

Skyair gqi-eco series heat pump r-410a 50hz
Table of Contents

Advertisement

ESIE12-06
Operation by the Test Operation Mode
As test run by the test operation mode, there are two methods as shown below.
<Test Operation by Wireless Remote Controller>
1. Press the Inspection / Test Operation button 4 times.
2. When you press the [ON / OFF] button after setting the test run mode, the test run starts.
<Test Operation by Outdoor Unit PCB>
1. Press the Test Operation (BS4) button on outdoor unit PCB for 5 seconds. After a while, the
(Reference)
• For the initial operation after installation of the unit, forced cooling operation continues for
• For the second operation and afterwards after installation, the unit forcibly operates for 30
Field Setting
Normal
test operation starts.
three minutes.
minutes in the set mode.
Press the Inspection / Test
Operation button 4 times.
Emergency Operation
Test operation mode
153

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents