Ceramic Bricks - Valor VENTANA 1200EAN Installation & Operating Instructions Manual

Direct vent zero clearance fireplace
Table of Contents

Advertisement

The following guidelines apply for all brick liners.
1. Inside the firebox, on the top of each side, release
the screw of the side brick anchors (one per side).
2. Place the rear panel against the back of the firebox,
behind the retainer at bottom.
3. Hold the left hand side panel at an angle and insert
it totally inside the firebox, behind the top outer
edge of the firebox. This will greatly facilitate the
installation. Slide the bottom first and then the top
against the side of the firebox. Rotate the side brick
anchor to hold the panel in place.
26

Ceramic Bricks

Top of panel
behind the top
outer edge of
the firebox
4. Place the top panel over the top edge of the rear
and side panels. Leave the panel to balance there
until right hand side panel is installed.
5. Hold the right hand side panel at an angle and
insert it totally inside the firebox, behind the
top outer edge of the firebox. This will greatly
facilitate the installation. Slide the bottom first
and then the top against the side of the firebox.
You may have to lift the top panel slightly to avoid
scratching it. Rotate the side brick anchor to hold
the panel in place.
6. Make any adjustment by moving the rear top panel
slightly.
7. Tighten the side brick anchors on each side of the
firebox.
Top of panel
behind the top
outer edge of
the firebox

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vetana1200engVentana 1200eapVentana 1200lpg

Table of Contents