Ceramic Rocks 534Rsk - Valor H4 650JN Installation Manual

Direct vent zero clearance gas fireplace
Table of Contents

Advertisement

Installation

Ceramic Rocks 534RSK

Unpack the ceramic rock kit very carefully to avoid damaging the fragile material. Install the components as shown
below. Please note that the position of the rocks and twigs (if used) is critical to ensure proper performance of
the appliance.
1. Install the front support platform in the fi rebox
carefully sliding it down between the burner
and the front bottom edge of the fi rebox while
avoiding scraping the side ceramic panels.
2. Place the rock ceramic base on the log support
behind the burner. The front bottom of the
base must rest against the front lip of the log
support.
3. Install the ceramic platform in the fi rebox rotat-
ing down to insert the front fi rst behind the
front support. Lay the back of the ceramic plat-
form against the rear ceramic panel again being
careful not to scrape the ceramic panels.
ATTENTION!
The ceramic platform is quite fragile.
DO NOT force it in place!
2
1
Fuel Beds
Fuel Bed Base
installed
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

H4 650jp

Table of Contents