2.14.1 installing gas bottle
Always fasten the gas bottle properly in the vertical position, in a special holder against the
wall or on a cylinder carriage. Remember to close gas bottle valve after welding.
parts of gas flow regulator
1
1.
Gas bottle valve
2.
Flow regulation screw
3.
Connecting nut
4.
Hose tail
5.
Hose tail nut
6.
Gas bottle pressure gauge
7.
Shielding gas flow meter
2.15 main switch i/O
When you turn the main switch of the FastMig power source into I-position, the pilot lamp
closest to this switch will illuminate, indicating the power source is ready for welding. The
equipment will return to the operation state as before the main switch was turned to the zero
position.
Always start and switch off the machine with the main switch, never use the mains plug as a
switch.
© Kemppi Oy / 1336
6
3
7
2
5
4
EN
13