Mira DISCOVERY Installation And User Manual page 25

Thermostatic mixer
Table of Contents

Advertisement

3.8 Fit the hot and cold supply pipes and
tighten the compression nuts.
Falling Supplies: For falling supplies
loosen the grubscrew on each Elbow
using the 2.5 mm Hexagon Key (supplied).
Remove the Elbows and install on
opposite sides. Secure the Elbows with
the Grubscrews.
Caution! Do not overtighten.
Note! Make sure that the Filter Plugs are
positioned to the front (i.e. Hexagonal Key
facing forward).
Caution! Make sure that the olives
are fitted and all pipework is flushed
through before connecting to the Shower
Control.
3.9 Fit the outlet pipework, leaving enough
pipe through the wall to temporarily cap
off.
3.10 Turn on the water supplies and check for
leaks.
3.11 Fit the Shower Fittings, refer to your
Fittings Installation and User Guide for
instructions.
3.12 Fit the Concealing Plate and Control
Assembly, refer to section: 'Control
Assembly'.
25
Outlet Pipe to
Fittings
Cold Supply
Hot Supply

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents