Installation checklist
The installer must complete the installation checklist below and make sure this guide is left
with you. They must also instruct you about the use and care of the appliance, and ensure
you understand the safety instructions and operation of the appliance.
Checklist
F Appliance positioned in a suitable location (clearances, mantels, surrounds etc.).
F Rinnai flue system installed and tested to ensure effective draw.
F Gas pressure checked, set, and down rated (if applicable) according to data plate instructions
F Burn media installed as per instructions.
F Appliance tested for correct operation and to ensure no gas leaks.
F Customer instructed on operating procedure and safety requirements.
F Customer advised to service the heater every two years.
Installer details
Company name:
Installer name:
Address:
Phone:
Certificate of compliance number for installation:
Signed:
18 | Arriva 752 Operation Guide: 12219-A 01-12
Mobile:
Date: