Installation Checklist - Rinnai 650 Operation Manual

Hide thumbs Also See for Rinnai 650:
Table of Contents

Advertisement

INSTALLATION CHECKLIST

It is the responsibility of the installer to complete both the "Installation Checklist" below and the
"Installation Record" on the next page at the completion of installation.
IMPORTANT
Instruct customer on the heater operation and ensure the customer understands the content of
the operation manual.
IMPORTANT
Advise the customer that during the initial burning period of approximately 2 hours, some
smoke and odour may be experienced.
During this period the heater should be operated on 'High' and the space being heated should
be well ventilated. It may take up to 20 minutes of operation for the logs to achieve their full
flame pattern and glow.
Complete the "Installation Record" on page 17.
THE GUARD IS FITTED TO THIS APPLIANCE TO REDUCE THE RISK OF FIRE OR INJURY
FROM BURNS AND NO PART OF IT SHOULD BE PERMANENTLY REMOVED.
WARNING
FOR PROTECTION OF YOUNG CHILDREN OR THE INFIRM, A SECONDARY GUARD IS
REQUIRED.
The guard supplied with this appliance MUST NOT be permanently removed as it fulfils an
operational safety function. Additional dress guards including free standing types may be used
in conjunction with, but NOT replace, the dress guard supplied with this appliance.
The appliance is not intended for use by young children or infirm persons without supervision.
Young children and the infirm SHOULD be supervised at all times when in the vicinity of this
heater while it is in operation.
Ensure the Customer understands that:
No part of this appliance should be permanently removed.
Young children and the infirm should be supervised at all times.
Paper or other material MUST NOT be burnt in this appliance.
The following checklist is to be completed ONLY by a Certified Gas Installer.
IMPORTANT
Is the appliance positioned in a suitable location (clearances, combustible clearances, mantels
1.
and surrounds etc.)?
2. Was a Rinnai approved flue system installed and tested in accordance with the instructions?
3. Has the gas pressure been checked and set?
4. Has the log set / burn media been installed as per instructions?
5. Was the appliance tested for correct operation and to ensure no gas leaks?
6. Has combustion product spillage testing been conducted in accordance with AS/NZS5601?
7. Has the customer been instructed on operating procedure and safety requirements?
8. Is the end-user fully aware of operating procedure?
9. Has the Glass Dress Guard been fitted?
10. Has the customer been advised not to remove the dress-guard?
11. Has the customer been advised to service the heater every two years?
Rinnai
16
No Yes
RDV 600_700ER OM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rinnai 750Rdv600erRdv700er

Table of Contents