Short Term Storage - Titan 100 Owner's Manual

Advantage series
Hide thumbs Also See for 100:
Table of Contents

Advertisement

Short Term
Storage
Start
You will need:
• Water
• Plastic bag or bucket
• Rags
• Stir stick
This procedure should be used when taking
a short term break or when ending your
project for the day. If your break is longer
than 16 hours follow Cleanup instructions,
page 16.
Instructions are for latex
materials only
note: If using oil based material follow
instructions for Cleanup on page 16.
Shutdown
1
1. Peform the Pressure Relief
Procedure, page 7.
Startup
1
1. Remove the spray gun from
the plastic bag or the water.
15
2
OR
2. Place spray gun in plastic
bag or immerse into bucket of
water.
2
2. If water was added during
shut down, stir water into
material with the stir stick.
3
3. Pour 1/2 cup water slowly on
the top of the paint to prevent
the paint from drying.
Place the entire spraying
system out of the sun.
3
Page 9
3. Follow getting material to
Flow instructions, page 9.
English
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

200

Table of Contents