Testing - FULTON VMP-W 40 -150 HP Installation And Operation Manual

Vertical multi-port hot water boilers
Table of Contents

Advertisement

INSTALLATION
Side Wall
Vent
Termination
(By Others)
3. The draft fan should be located as close to the ue
outlet as possible.
4. Draft regulation su cient to lower the draft to between
-0.02 to -0.04 " wc may be required. The draft regulator
must be between the boiler and the fan.
5. The draft fan shall have an air ow proving switch wired
in series with the boiler air safety switch.
6. The sidewall vent total length from boiler exhaust to
termination shall not exceed 35 feet (10.6 m) with 4
elbows maximum.
2-16
Air Flow
Side Wall Vent
Safety Switch
(By Others)
U.L. Approved
Induced Draft Fan
FIGURE 3 TYPICAL SIDEWALL VENTING

Testing

Upon completion of the installation, perform the following
testing:
1. A pneumatic test of water piping not exceeding 15
2. Leak tests at all welds and joints to ensure that the
VMPW-IOM-2012-1001
psig.
system is free from leaks.
SECTION 2