4.3 Initial operation menu

4.3.1
Overview
The initial operation menu distinguishes between the initial operation of a device
in a new PLATINUM® network to be configured and modifications to an existing
PLATINUM® network (exchange inverter, new configuration).
Initial operation
Start
Language
Network scan
Change device number
Country code *
Date
Time
* The country code can only be changed four hours after initial opera-
tion and feed-in starts. This menu will not be displayed later.
4.3.2
Description of the initial operation menu
Changing the date and time can cause saved data to be overwritten or
lead to gaps in data logging.
During initial operation, the date and time must be entered correctly
once.
Installation and user guide PLATINUM® inverter 5500 R3-S2, 7000 R3-S2, 8000 R3-S2, 9000 R3-S2
Exchange inverter/new configuration
Start
Language
Network scan
Exchange inverter
Reassign numbers
Country code *
Date
Time
Initial operation
21