NEC Express5800/B120a User Manual page 276

Express5800/bladeserver series
Hide thumbs Also See for Express5800/B120a:
Table of Contents

Advertisement

9-18 Upgrading Your Server
8.
Open the levers at both ends of the DIMM socket.
9.
Push the DIMM into the socket straight.
IMPORTANT:
too much pressure can damage the socket. Keyed DIMMs insert only
one way.
NOTE:
side of the DIMM has a cut-out to prevent an incorrect insertion.
If the DIMM is inserted into the DIMM socket, the lever is automatically closed.
10.
Close the lever firmly.
11.
If you need to install two or more DIMMs, install them according to steps 8 through 10.
12.
Install the components removed in steps 1 and 2.
13.
Make sure that no error message appears on the POST screen.
See Chapter 8 for details of the POST error messages.
14.
Run SETUP and select menus in the order of [Advanced] and [Memory Configuration] to
make sure that "DIMM Group #1 Status" is set to "Normal" (see Chapter 4).
15.
Set [Advanced] – [Reset Configuration Data] in the [Advanced] menu to [Yes].
This is required to update the hardware configuration information. See Chapter 4 for
details.
16.
Set the paging file size to a value larger than the recommended value (installed memory *
1.5) (for Windows).
Key slot
Use extreme care when installing a DIMM. Applying
Make sure of the orientation of the DIMM. The connecting
Key

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8400-083fN8400-084fN8400-085f

Table of Contents