Section 7: Appliance Set-Up; Leveling System; Outside Air Kit - Quadra-Fire MTVERNINSAE-MBK Owner's Manual

Mt vernon pellet insert advanced energy
Hide thumbs Also See for MTVERNINSAE-MBK:
Table of Contents

Advertisement

Mt. Vernon Pellet Insert (AE)
7
Appliance Set-Up
A. Leveling System
The leveling bolts are located on the sides of the appliance,
front and rear. To access the bolts, remove the front access
panels. Reach in and turn the bolt to the desired height to
level the appliance.
Figure 20.1
Figure 20.2
Page 20
Leveling Bolts - 2 on each side
Collar
Wire Ties
Trim Ring
Termination Cap
B. Outside Air Kit Instructions
Included in Kit: 2 wire ties, 1 collar assembly,
1 termination cap assembly, 1 trim ring, fasteners.
NOTE: 3 INCH (76mm) ALUMINUM FLEX PIPE NOT
INCLUDED.
Tools Needed: Phillips head screw driver; wire cutters;
hole saw or jig saw.
1. Measure distance from fl oor to air vent opening in appli-
ance and mark location on wall.
2. Use saw to cut opening in wall. Cut a 3-1/2 to 4 inch
(89-102mm) opening on inside wall and a 4 to 4-1/2
inch (102-114mm) opening on outside of house.
3. Use wire ties to secure fl ex pipe to collar assembly.
4. Slide trim ring over fl ex pipe and run pipe through wall.
5. Attach fl ex pipe (not included) to outside termination
cap with second wire tie.
6. Secure termination cap to outside surface.
7. Secure trim ring to interior wall.
Never draw outside combustion air from:
Wall, fl oor or ceiling cavity
Enclosed space such as an attic or garage
3 inch Aluminum Flex
Pipe (not included)
7036-135F
CAUTION
August 27, 2009
R

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtverninsae-pmhMtverninsae-csbMtverninsae-cwl

Table of Contents