To install the component:
Power down the server (on page 20).
1.
Do one of the following:
2.
Unlock and remove the bezel
o
Extend the server from the rack (on page 21).
o
Remove the access panel (on page 21).
3.
Remove the applicable media bay blanks
4.
IMPORTANT:
Identify the guide screws
5.
Install the guide screws.
6.
Install the tape drive.
7.
Install a SAS controller
8.
Connect the power cable to the rear of the drive.
9.
("Open or remove the tower
("Remove the media bay
For correct cabling, install the full-height tape drive in the top two slots.
("Identifying guide
("Installing expansion
bezel" on page 20).
blank" on page 23).
screws" on page 58).
boards" on page 64).
Hardware options installation 62