Installing A Server In A Rack - HP PROLIANT ML330 G6 User Manual

Hewlett-packard server user manual
Hide thumbs Also See for PROLIANT ML330 G6:
Table of Contents

Advertisement

WARNING:
plug telephone or telecommunications connectors into RJ-45 connectors.
Connect the power cord to the rear of the server.
2.
Connect the power cord to the AC power source.
3.
WARNING:
Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at
all times.
Unplug the power cord from the power supply to disconnect power to the equipment.
Do not route the power cord where it can be walked on or pinched by items placed
against it. Pay particular attention to the plug, electrical outlet, and the point where the
cord extends from the server.

Installing a server in a rack

The procedure to install the tray in the rack is similar to the procedures to install a server in a rack. For
more information, see the 2U Quick Deploy Rail System Installation Instructions that shipped in the rail kit.
CAUTION:
predetermined location on the rack so that airflow clearance issues are resolved. For airflow
clearance information, refer to the documentation that ships with the server.
To install the component:
See the "Installing the Product into a Rack" section of the 2U Quick Deploy Rack Rail System
1.
Installation Instructions to do the following:
Install the component rails on the tray.
a.
Install the rack rails in the rack.
b.
Install the tray onto the rack rails, and then partially slide the assembly into the rack.
2.
To reduce the risk of electric shock, fire, or damage to the equipment, do not
To reduce the risk of electric shock or damage to the equipment:
To avoid damage to the equipment, be sure that the rack rails are installed in a
Setup 32