Figure 3-7 I/O Chassis Mounting Screws - HP A9834-9001B User's & Service Manual

Hewlett-packard integrity superdome server user service guide
Table of Contents

Advertisement

Step 3. Verify that the I/O chassis mounting screws are in place and secure (Figure 3-7).
Inspect all components for signs of shifting during shipment or any signs of damage.

Figure 3-7 I/O Chassis Mounting Screws

Moving the Cabinet Off the Pallet
Step 1. Remove the shipping strap that holds the BPSs in place during shipping (Figure 3-8 on page 86).
Failure to remove the shipping strap will obstruct air flow into the BPS and FEPS.
Chapter 3
Installing the System
Unpacking and Inspecting the System
Mounting screws
I/O chassis
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integrity superdome sx2000

Table of Contents