Test Timing - HP OMNIBER 718 37718A User Manual

Dsn/sonet operation
Table of Contents

Advertisement

Description
HOW TO:
Making Measurements

Test Timing

Test Timing
There are two aspects to test timing:
• Error results may be displayed as short term or cumulative over the
measurement period.If short term error measurements are required,
the short term period may be selected.
• The period of the test may be defined or controlled manually.
1 Choose
TIMING CONTROL
2 Choose the SHORT TERM PERIOD to the timing required for short
term results.
3 Choose the type of TEST TIMING required:
For manual control with
For a single timed measurement period started with
choose
and choose the Test duration.
SINGLE
For a timed period starting at a specified time, choose
the Test duration and the test START date and time.
on the
display.
RESULTS
choose
MANUAL
RUN/STOP
.
,
RUN/STOP
, choose
TIMED
69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

37718a omniber 718

Table of Contents