Shutting Down The Subsystem; Monitoring The Shutdown - Promise VTRAK M610i Product Manual

Table of Contents

Advertisement

Shutting Down the Subsystem

You can only do part of this function in WebPAM PROe. Additional action is
required, as described below. To shutdown the subsystem:
1.
Click the Subsystem
2.
Click the Administrative Tools
3.
Click the Shutdown link in Management View.
A Shutdown or Restart tab will appear.
4.
On the Shutdown or Restart tab, choose Shutdown from the dropdown
menu.
5.
Click the Submit button.
6.
In the confirmation box, type the word confirm in the field provided.
7.
Click the OK button.
When the controller shuts down, your WebPAM PROe connection will be
lost.
8.
Wait for no less than two minutes.
9.
Manually turn off the power supply switches the back of the subsystem.

Monitoring the Shutdown

To monitor a shutdown, you must use the Command Line Interface (CLI) though
a serial connection to the VTrak.
At the "administrator@CLI>" prompt, type shutdown -a shutdown.
When the "Shutdown complete. It is now safe to power off the subsystem."
message appears, turn off the power supply switches.
Chapter 4: Management with WebPAM PROe
icon in Tree View.
icon.
89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vtrak m310iVtrak m210i

Table of Contents