Verify The Switch Passes Self Test - HP ProCurve 1600M Installation Manual

Switches and hubs
Table of Contents

Advertisement

Installing the Switch 1600M and 2424M
Installation Procedures

3. Verify the Switch Passes Self Test

Before mounting the switch in its network location, you should first verify that
it is working properly by plugging it into a power source and verifying that it
passes its self test.
1.
N o t e
The Switch 1600M and Switch 2424M do not have a power switch. They are
powered on when the power cord is connected to the switch and to a power
source.
If your installation requires a different power cord than the one supplied with
the switch, be sure to use a power cord displaying the mark of the safety
agency that defines the regulations for power cords in your country. The mark
is your assurance that the power cord can be used safely with the switch.
2.
N o t e
2-8
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a properly grounded electrical
outlet.
Connect power cord to
the power connector
Check the LEDs on the switch and on the switch module (if installed in
the switch). The LED behavior is described on the next page.
The illustration on the next page shows a Switch 1600M. The LEDs on the
Switch 2424M are located differently than what is shown, but the LED
behavior is the same as described on the page.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents