Power control port
The.options.port.of.the.AdderView.CATxIP.
1000.can.be.used.to.connect.to.one.or.more.
optional.power.control.units..This.allows.you.to.
control.the.mains.power.being.supplied.to.the.
connected.computer(s).so.that.an.authorised.
user.can,.if.necessary,.perform.a.complete.
remote.cold.reboot.on.a.failed.system.
The.control.connector.of.the.first.power.switch.
is.attached,.via.serial.cable,.to.the.rear.panel.of.
the.AdderView.CATxIP.1000..Any.additional.power.switches.are.then.attached.
via.a.'daisy-chain'.arrangement.to.the.first.power.switch..Each.power.switch.box.
is.then.given.a.unique.address.and.access.to.each.power.port.(8.ports.on.each.
power.switch.box).is.gained.using.a.combination.of.the.switch.box.address.and.
the.port.number..
'Daisy-chain'
control
connections
IN
1
2
Box
OUT
IN
1
2
Box
OUT
IN
1
2
Box
OUT
IN
1
2
Box
The.power.ports.are.connected.to.the.power.inputs.of.each.computer.system.
and.the.power.switch.box(es).are.then.connected.to.a.mains.power.supply.
IMPORTANT: Power switching devices have a maximum current rating. It is
essential to ensure that the total current drawn by the equipment connected
to the power switching device does not exceed the current rating of the power
switching device. You must also ensure that the current drawn from any mains
socket does not exceed the current rating of the mains socket.
Setting.up,.configuring.and.using.power.switching.requires.three.main.steps:
•. Connect.and.address.the.switch.boxes.
•.
Configure the power strings
•.
Operate.power.switching.via the VNC toolbar or.the.local.Functions
LOCAL
GLOBAL
USER
USER
POWER
IN
CAM
COMPUTER
SYSTEM
SWITCH
Power
LOC REM OSD UPG LCK PWR
switch
only
KVM
www.adder.com
boxes
3
4
5
6
7
8
3
4
5
6
7
8
Power to computer
Box , port - address:
3
4
5
6
7
8
3
4
5
6
7
8
To connect and address the switch boxes
Note: The AdderView CATxIP 1000 unit can be powered on during this
procedure, however, the switch boxes should be switched off. The configuration
steps below are for the Adder EPS-M8 and EPS-S8 power switches. Other power
IP
switches may require different configuration. Please refer to your power switch
documentation.
1. Mount.up.to.four.switch.boxes.in.positions.where.they.are.close.to.the.
computer.systems.that.they.will.control.and.not.too.distant.from.the.
POWER
AdderView.CATxIP.1000.unit.(preferably.within.2.5.metres).
2.
Use.a.serial.cable.with.an.RJ9.and.a.9-pin.D-type.connector.(see.Appendix
7.for.specification)..Attach.the.RJ9.plug.to.the.socket.marked.
first.switch.box..Attach.the.other.end.to.the.socket.marked.
AdderView.CATxIP.1000.
Serial cable to first
power switch box
3. For.each.of.the.remaining.switch.boxes.(if.used),.use.a.serial.cable.with.RJ9.
connectors.at.both.ends.(see.Appendix
end.to.the.socket.marked.
socket.marked.
IN
4. Set.the.addressing.switches.on.each.switch.box.
using.the.two.micro.switches.marked.'Slct'.on.
the.front.panel..The.box.connected.directly.to.
the.AdderView.CATxIP.1000.is.Box.1.and.so.on,.
down.the.daisy-chain.line.to.Box.4.at.the.end.
5. Attach.IEC.to.IEC.power.leads.between.
each.port.and.the.power.input.socket.of.
each.computer.system.that.requires.power.
switching..Carefully.note.to.which.power.
ports,.on.which.boxes,.each.computer.system.is.connected..If.computer.
systems.have.multiple.power.inputs,.then.each.input.must.be.connected.via.
separate.ports,.which.can.be.on.the.same,.or.different.boxes.
6. Connect.each.box.to.a.suitable.mains.power.input..
Now.proceed.to.the.configuration.stage.covered.in.the.Power switching
menu.
configuration.section.within.the.Configuration.chapter.
AdderView CATxIP
000 rear panel
O P
T I O
N S
5 V
2 . 0
A
7.for.specification)..Attach.one.
.of.the.previous.box.and.the.other.end.to.the.
OUT
.of.the.next.box..
Box
. 1...
. 2.
. 3.
. 4.
Off = switch upwards
On = switch downwards
Switch is on the left side
.on.the.
IN
.on.the.
OPTIONS
1 6
1
1 2
C O
1
M P
U T
Switch Switch .
Off.
Off
On.
Off
Off.
On
On.
On
Need help?
Do you have a question about the AdderView CATxIP 1000 and is the answer not in the manual?
Questions and answers