Completing The Task; Installing Additional Dimm Memory Modules; Required Tools - Fujitsu PRIMERGY RX900 S2 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX900 S2:
Table of Contents

Advertisement

9.2.6

Completing the task

Perform the following procedures to complete the task:
1.
"Closing the server" on page 47
2.
"Mounting the server in the rack" on page 49
3.
"Bringing the server back to operation" on page 51
4.
"Closing the rack door" on page 51
9.3
Installing additional DIMM memory
modules
Authorized personnel
Authorized specialist personnel can carry out replacement tasks for
integral server components. Ask you local Fujitsu service center for
more detailed information.
V
CAUTION!
Procedures indicated as "Authorized personnel only" must be
done by Fujitsu service personnel or technicians trained by
Fujitsu for doing these tasks. Please note that unauthorized
interference with the system will void the warranty and exempt
the manufacturer from all liability.
9.3.1

Required tools

Starting and completing the task:
– key for the rack doors (if applicable)
– Phillips Ph2 screw driver
Installing the DIMM memory module: tool-less
RX900 S2
Upgrade and Maintenance Manual
Main memory
191