A- 25 mm (1 po.) minimum;
1- Combustible wall;
2- Non-combustible spacer;
3- Brick.
Graphic 6
A- 25 mm (1 po.) minimum;
1- Combustible wall;
2- Non-combustible spacer;
3- 0.61 mm (0.024") sheet metal;
4- Brick
1.2.2 Door overlay installation
Remove the four screws from the door. Position the overlay on the door. Secure it using the four
screws removed previously.
8