Removal Of Electrical Box - Daikin CTXS09GVJU Service Manual

Super multi nx g-series
Hide thumbs Also See for CTXS09GVJU:
Table of Contents

Advertisement

SiUS12-814
1.2

Removal of Electrical BOX

Procedure
Step
1. Removing the tie wires
1
The figure shows the tie
pipe connections.
2
Remove the terminal
board fitting screw.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Outdoor Unit – 2MXS18GVJU
Points
2MXS18GVJU has only 2
ports.
Remove the piping in the
backward direction.
Match the colours of the tie
wires to A, B, C and D ports
as follows.
(1) - Black Power
(2) - White Power
(3) - Red Transmission
Wires are fixed to the
terminal board with screws.
Terminal board is made of
integral moulded resin.
171

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents