Click
, and when the Create a Policy screen is opened, enter "PurgeTest" into the "Policy Name" field, select
Purge, and click OK.
3
Click the Source tab and select the TeraStation on which recorded video is saved under "Vault".
4
Open the Criteria tab, and under "Miscellaneous Options", set Watermark: High and Watermark: Low.
For example, the settings below delete old data when the amount of used media space exceeds 80% until it drops
to 40%.
Set Watermark: High to "80" and Watermark: Low to "40".
5
Set the job execution date and time from the Scheduling tab. This example shows a job to be executed at 2:00 am
on weekdays.
• Select On selected days each week.
• Select every day between Monday and Friday.
• Select "2:00" and "AM", then click OK.