Installation Instructions- Coin Slide Assembly Installation Instructions - Gas Dryer; Make Gas Connection; Connect Vent; Complete Installation - Whirlpool CSP2760TQ2 Installation Instructions Manual

Commercial stacked dryer gas (120-volt,60-hz)or electric (120/240-volt,60-hz)
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION INSTRUCTIONS - GASDRYER
Excessive Weight Hazard
Use two or more people to move and install dryer.
Failure to do so can result in back or other injury.
1. Remove red cap from gas pipe.
2. Connect gas supply to dryer. Use pipe-joint compound
resistant to the action of LR gas for gas connections. If
flexible metal tubing is used, be certain there are no kinks.
If necessary for service, open the toe panel. Use a putty knife
to press on the toe panel locks located at the upper corners
of the toe panel. Pull downward on the toe panel to open.
Toe panel is hinged at the bottom.
3. Open the shutoff valve in the gas supply line.
4. Test all connections by brushing on an approved noncorrosive
leak-detection solution. Bubbles will show a leak. Correct any
leaks found.
1. Using a 4" (102 mm) clamp, connect vent to exhaust outlet
on rear of dryer. If connecting to existing vent, make sure the
vent is clean. The dryer vent must fit over the dryer exhaust
outlet and inside the exhaust hood. Make sure the vent is
secured to exhaust hood with a 4" (102 mm) clamp.
2. Using two or more people, move dryer to desired installation
location. Do not crush or kink vent. Make sure dryer is level.
3. Check that there are no kinks in the flexible gas line.
1=
With dryer in final position, place level on top of the dryer, first
side to side; then front to back. If the dryer is not level, adjust
the legs of the dryer up or down until the dryer is level.
Electrical Shock Hazard
Plug into a grounded 3 prong outlet.
Do not remove ground
prong.
Do not use an adapter,
Do not use an extension
cord.
Failure to follow these instructions can result in death,
fire, or electrical shock.
2. Plug into a grounded 3 prong outlet.
3. Check dryer operation.
Select a full heat cycle, let the dryer run for at least five
minutes. Dryer will stop when time is used up.
NOTE: Dryer door must be closed for dryer to operate. When
door is opened, dryer stops, but time continues to count
down. To restart dryer, close door and resetect cycle.
4. If the burner does not ignite and you can feel no heat inside
the dryer, shut off dryer for five minutes. Check that all supply
valve controls are in "ON" position and that the electrical cord
is plugged in. Repeat five-minute test.
INSTALLATION INSTRUCTIONS-ELECTRICDRYER
Excessive Weight Hazard
Use two or more people to move and install dryer.
Failure to do so can result in back or other injury.
Power
Supply
Cord Method
- U.S. Only
[]
This dryer is manufactured ready to install with a 3-wire
electrical supply connection. The neutral ground conductor is
permanently connected to the neutral conductor (white wire)
within the dryer. If the dryer is installed with a 4-wire electrical
supply connection, the neutral ground conductor must be
removed from the external ground connector (green screw),
and secured under the neutral terminal (center or white wire)
of the terminal block. When the neutral ground conductor is
secured under the neutral terminal (center or white wire) of
the terminal block, the dryer cabinet is isolated from the
neutral conductor.
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csp2761tq4Csp2760tq3Csp2761tq3

Table of Contents