Sliding Rails Installation - Planet NAS-7450 User Manual

Network storage systems
Hide thumbs Also See for NAS-7450:
Table of Contents

Advertisement

10. Press the power button on the left hand corner of your NAS server.
11. Wait for the server to boot up. The boot up process takes approximately 2 minutes.

2.2 Sliding Rails Installation

1. Make sure that you have the following the mounting parts for the sliding rails.
4 L-shaped brackets (see the left side of the photo)
8 x "M4" size screws, 8 x "M5" size screws and 6 x "#6-32" size screws.
2. Take the sliding rail apart by sliding out the center slide. Push down the hook to separate them. Pull
the center slide all the way until it reaches the end.
3. Now install the center slide to the rack-mount chassis. Find the screw holes on both sides of the
rack-mount chassis, which are used for mounting the center slide. Fasten the "#6-32" screws to fix
the center slides onto chassis. Later, the center slides will be used for attaching to the sliding rail.
#6-32
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nas-7850

Table of Contents