Planet NAS-7450 User Manual page 13

Network storage systems
Hide thumbs Also See for NAS-7450:
Table of Contents

Advertisement

Figure 2
4. Slide the hot swap hard disk tray slowly into the chassis, push the outer rim of the tray as shown in
Figure 3 until the lever retract slowly toward the tray. Then, push the level down as far as it can go to
connect the hot swap hard disk tray to the chassis.
NAS-7450/NAS-7850 rack-mount server installation
1. Pull out a HDD tray from the server.
2. Secure and mount a hard disk onto the HDD tray using four screws under the tray.
3. Insert the HDD tray back in the server. Make sure the lever of the HDD tray is properly in place.
4. Repeat Step 1 to Step 3 if necessary for the other HDD tray.
5. Install the provide rack mounting handles at both side of the NAS server.
6. Install the NAS server in the rack. (Refer to the paragraph "Sliding Rails Installation" in Chapter 2
section 5)
7. Connect your NAS server to the network by attach a LAN cable from the LAN port located at the back
of your NAS server.(At least one network connection is required)
8. Plug the power cord into the power connector on you NAS server.
9. Make sure the power switch on the power supply is in on position.
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nas-7850

Table of Contents