Alcatel SpeedTouch 610 Orientation Manual page 14

Business dsl router 600 series
Hide thumbs Also See for SpeedTouch 610:
Table of Contents

Advertisement

1 SpeedTouch™610 Installation
Powering
POST phases
10
Once all previous steps are completed, you can turn the SpeedTouch
the power switch.
As soon your SpeedTouch610 is turned on, you can check the "PWR/Alarm" LED to
see how the Power On Self Test (POST) progresses.
Phase
"PWR/Alarm" LED Indication
1
Flashing red
2
Solid red
Solid green
610 on (I) with
Description
POST pending
Start-up failed
POST failed
Normal operation
3EC 37770 AAAA TCZZA Ed. 02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Speedtouch 610sSpeedtouch 610iSpeedtouch 610v

Table of Contents