Time schedules are windows of time defined by a
start time, a stop time, and the days of the week
these times are effective.
You can create up to 16 time schedules for setting
up the following system features: Latchkey Paging,
Notify by Exception, and light control.
An LED touchpad or Touchtone phone can be
used to create time schedules, but an alphanu-
meric touchpad works much better because of
its extensive feedback.
See Appendix C for LED and phone program-
ming instructions.
To define a time schedule:
1. At an alphanumeric touchpad, enter
User Programming by pressing
9
+ System or Partition Master
B
2. Press
until the touchpad displays
"SET UP SCHEDULES," then press
The touchpad displays the first time schedule,
"SCHEDULE 00."
B
3. Press
until the touchpad displays the time
schedule you wish to set, then press
The touchpad displays the current start time
for this schedule.
4. Enter the start time in 24-hour format
(00:00–23:59), then press
The touchpad displays the new start time.
5. To display the current stop time for this
B
schedule, press
once.
6. Enter the stop time in 24-hour format, then
ƒ
press
. The touchpad displays the new
stop time.
B
7. Press
until the touchpad displays a day of
the week you wish to assign this schedule to.
2
8. Enter
to include the day in
the schedule ("ON") or
exclude the day from the
schedule ("OFF").
ƒ
9. Press
to secure your choice.
B
10. Press
to move to the next day of the week
or press
to return to the schedule list.
7
ƒ
11. Press
+
+
ming.
CHEDULES
CODE
.
ƒ
.
ƒ
.
ƒ
.
1
1
to
2
to exit User Program-

Scheduling Consecutive Days

There may be instances when you'd like to schedule
a feature event to start one day and stop the next
day or a number of days later.

One Day Rollover

You can create a schedule that begins on one day,
and stops the next day by using only one time
schedule. (The stop time must be within 24 hours
of the start time.)
Example 1 of One Day Rollover.
At home you'd like the Latchkey Open-
ing feature to be effective from 10 p.m.
on Tuesday until 5 a.m. on Wednesday.
By taking advantage of One Day Roll-
over, one time schedule can cover both
days. (That schedule is illustrated at
right.)
Notice how the stop time is within 24
hours of the start time. The system
knows to apply the stop time to the
next day (5 a.m. on Wednesday).
Example 2 of One Day Rollover.
Building on Example 1, let's say that
you'd like the Latchkey Opening fea-
ture to be effective between 10 p.m.
and 5 a.m., Monday through Friday
(ending Saturday morning).
By simply applying the start and stop
times to each day, one time schedule
can cover the entire week.

Multiple Day Rollover

The simplest method for defining a window of time
that spans multiple days is to use 99:99 to signify an
open start or stop time.
21

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CONCORD and is the answer not in the manual?

Table of Contents