Platform Setup; Connecting The Wires - Intel CoreTM 2 Duo Processor User Manual

Table of Contents

Advertisement

2.0

Platform Setup

Note:
Before connecting power make sure that the CRB (Customer Reference Board) is either
mounted in a chassis or is on a non-conductive surface to prevent grounding. Ensure a
safe work environment. Make sure you are in a static-free environment. Before
removing any components from their anti-static packaging. The evaluation board is
susceptible to electrostatic discharge, which may cause product failure or unpredictable
operation.
Caution:
Connecting the wrong cable or reversing a cable may damage the evaluation board and
may damage the device being connected. Since the board is not in a protective chassis,
use caution when connecting cables to this product.
2.1

Connecting the Wires

Note:
When you receive the CRB, all jumpers are correctly set and it is ready to boot.
User's Manual
26
Platform Setup
June 2007
Order Number: 316639-002

Advertisement

Table of Contents
loading

Table of Contents