SF-710/510/310
User's Guide
Measuring Time, Distance, and Speed (Chronograph
Function)
What is the chronograph function?
This function allows you to measure split times and lap times simultaneously. Also, since this device is equipped with a
GPS function, you can automatically measure distance, speed, and route using the positional information and time
from the GPS signal.
This is useful for a variety of activities such as running or walking, and can be used for competition or standard
exercise.
Note:
Set the Activity Type (Run, Walk, or Bike) before you start measuring.
"Mes. Settings" on page 87
U
Split Time
Measures the elapsed time from the start.
Press C to start measuring, and press C again to stop measuring.
Lap Time
Records the elapsed time for each lap.
To record a lap, press D while measuring.
Also, when using the AT Lap function, laps are recorded automatically when a time or distance set in advance has been
reached.
"Recording Laps Automatically (AT Lap Function)" on page 55
U
Measure
37
Need help?
Do you have a question about the SF-710 and is the answer not in the manual?
Questions and answers