Bowflex Xtreme 2 Assembly Instructions Manual page 20

Assembly manual
Hide thumbs Also See for Xtreme 2:
Table of Contents

Advertisement

Figure 20b - Left Main Assembly Pulleys
Left Squat Cable
Cable Shroud
Step 20b - Cable & Pulley Routing
Connect Left Squat Cable through the Floating and Main Assembly Pulleys
Repeat the same procedure completed during Step 20 for the Left Squat Cable.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents