Typical Assembly Layout - Space-Ray Infrared Radiant Tube Heater PTS Series Installation And Operation Instructions Manual

Infrared radiant tube heater single stage push through system (positive pressure)
Table of Contents

Advertisement

above.
7.1)

TYPICAL ASSEMBLY LAYOUT

–12–
2 Ft. Turbulator
MODEL
Sections
PTS/U 40
4
PTS/U 50
5
PTS/U 75
5
PTS/U 100
3
PTS/U 125
7
PTS/U 150
4
PTS/U 175
0
PTS/U 200
1
Form #43343330
May 08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF