Download Print this page

Space-Ray Tube Series PTS Specifications

Low intensity tube heaters

Advertisement

Quick Links

Advertisement

loading

Summary of Contents for Space-Ray Tube Series PTS

  • Page 2 ®...
  • Page 4 *When used indirect vented, clearances to ceiling from top of exhaust hood must be 12” on PTS/U (50-75), and 18” on PTS/U (100-200). If optional corner or U-bend reflec- tors are not used, clearance must be 18”. ** learance below the tube reduces to 72” 20 ft. downstream from the control box. Note: onsult factory if reduced clearances are required.