Trane Engineered Smoke Control System Application Manual page 127

For tracer summit
Table of Contents

Advertisement

Communication watchdog
Figure 66. Determining overall communication status for the system
Finally, the FSCP Comm Fault LED is controlled. A sample TGP
fragment is shown in Figure 67. The FSCP Comm Fault LED is also
controlled by the lamp test function. If a lamp test is not currently
running, the FSCP Comm Fault is controlled by the overall
communication status of the system.
Figure 67. Control of the FSCP Comm Fault LED
BAS-APG001-EN
115

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents