User Guide
4. Connection to a Master
Make sure that all the ePowerSwitch devices are powered off.
Connection Instructions
1. Connect the appropriate link-up cable to one of the xBus connector of the ePowerSwitch Master and
to one of the xBus connector of the ePowerSwitch 8XS. To cascade several Satellites, link the second
xBus connector of a Satellite with one of the xBus connector of the next Satellite.
Master unit
Link-up cable to the first satellite
EPS M8
RJ9M - DB9M
(Réf RJ9-DB9M 180, must be ordered
separately)
EPS 4M+
RJ45M - RJ45M (use supplied cable)
EPS 8M+
R2
EPS 8M+
Tiny
VizioGuard
EPS 8XM
RJ45M - RJ45M (use supplied cable)
VizioGuard
10/100
A 1 2 3 4
Link
100
A
B 1
A
B 1
RS232
x Bus
Term
S B 5 6 7 8 1
Link-up cable to the next satellites
(up to 4 Satellite units)
RJ45M - RJ45M or RJ11M - RJ45M
(see supplied cable set)
(up to 4 Satellite units)
RJ45M - RJ45M
(up to 16 Satellite units)
RJ45M - RJ45M
Slct
x Bus
RS232
Power
2
3 4 5
6 7
8
Term
Slct
x Bus
RS232
Power
2
3 4 5
6 7
8
Term
I/O
2 3 4
DC
DRY CONTACTS
MAX 24VDC - 20mA
12VDC AUX
POWER SUPPLY
Page | 8