Section 3: Operation; Boat Setup - Lowrance LMF-200 Installation And Operation Instructions Manual

Multi-function gauge
Table of Contents

Advertisement

The displays and settings in this digital gauge are controlled by a
three-button keypad. The buttons are
key provides access to menus and helps with data entry and command
execution. The
(highlight) menu items.

Boat Setup

When the LMF-200 is turned on the first time the Boat Setup menu
will appear on the screen. You will not be able to proceed without
completing boat setup. If, however, you have
one or more of the following devices — Suzuki
Engine Interface, EP-10 Fuel Flow, EP-15
Fluid Level, EP-45 Pressure Sensor or an EP-
50 Storage Device — already configured in the
network
with
configuration, you WILL NOT have to go
through boat setup when adding a new gauge
to the network. After adding the gauge to the network, the Boat Setup
menu will be cleared from the screen and the unit will begin normal
operation in 1-2 seconds. If you have more than one gauge on the
network, you will only have to execute Boat Setup for one of the
gauges. When the data is input, it is transmitted over the network and
saved to other units.
NOTE:
If you add an EP-10 Fuel Flow, EP-15 Fluid Level, EP-45 Water
Pressure or EP-50 Storage Device sensor to the network, you must
go through Boat Setup so the engine-tank configuration will be
consistent among sensors on the network.
To execute Boat Setup:
1. With Boat Setup highlighted on the screen, press
Setup menu will appear, allowing you to select an engine-tank
configuration that matches the number of engines and fuel tanks on

Section 3: Operation

and
UP
DOWN
LMF-200 keypad.
the
same
,
UP
DOWN
keys are used to scroll through and select
engine-tank
11
and
. The
MENU
. The Boat
MENU
MENU

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents