Installation And Setup; Power-Up Sequence - Fluke RF303 Operator's Manual

Electrosurgical analyzer
Table of Contents

Advertisement

Installation and Setup

The Analyzer has a universal power supply and automatically operates with
applied main voltages having a maximum range of 83-264 V ac. You do not
need to adjust voltage via jumpers or programming tabs to operate the
Analyzer.
Set up the Analyzer for operation by attaching the supplied power cord to the
power cord inlet located on the right panel of the Analyzer case. If necessary,
please refer to "Instrument Familiarity" to help you identify the power cord
inlet.

Power-Up Sequence

After plugging the Analyzer into a correctly rated earth-ground outlet, locate
the power switch on the right panel. Move the switch to the ON position
(marked with the
sequence:
1. The three front LED indicator lamps illuminate, and you see this
information momentarily appear in the display:
2. Next the installed version of the Analyzer's firmware briefly appears in
the display. Here's an example:
Installation, Setup, and Maintenance
symbol). Next, you should observe the following power-up

Installation and Setup

2
exz01.eps
2-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents