Schematics and Layout
Switch S1 allows the user to pull down four control signals to ground. LDAC, Uni/Bip B, RST, and Uni/Bip
A can be pulled low using the switch. By default, switch position S1.1 is open, causing LDAC to be
connected to ground. Switches S1.2 and S1.4 are open to short-circuit Uni/Bip A and Uni/Bip B to ground.
This configuration sets the DAC7716 to bipolar mode (default).
switch S1.
Switch S2 controls the reference voltage selection for Ref B. When the switch is furthest left (position 1),
the onboard 5V reference is used from the REF5050. When the switch is in the middle position (position
2), the onboard 2.5V reference is used from the REF5025. If the switch is moved to the right (position 3),
Ref B is set up to use an external reference. Pins J1.18 (Ref–) and J1.20 (Ref+) are used to apply an
external reference voltage.
Switch S3 controls the reference voltage selection for Ref A. The switch has the same functionality as
switch S2. By default, switch S2 and switch S3 are set to use the 5V onboard reference, as
shows.
7
Schematics and Layout
Schematics for the DAC7716EVM are appended to this user's guide. The bill of materials is provided in
Table
4.
7.1
Bill of Materials
NOTE: All components should be compliant with the European Union Restriction on Use of
Hazardous Substances (RoHS) Directive. Some part numbers may be either leaded or
RoHS. Verify that purchased components are RoHS-compliant. (For more information about
TI's position on RoHS compliance, see the
8
DAC7716EVM
Figure 3. Default Settings for Switch S1 (LDAC Low)
Figure 4. Default Settings for Switch S2 and S3
Copyright © 2009, Texas Instruments Incorporated
Figure 3
shows the default settings for
TI web
site.)
www.ti.com
Figure 4
SBAU159 – October 2009
Submit Documentation Feedback
Need help?
Do you have a question about the DAC7716EVM and is the answer not in the manual?