Digital Interface
3.1
Serial Data Interface
Samtec part numbers SSW-110-22-F-D-VS-K and TSM-110-01-T-DV-P provide a 10-pin, dual-row,
header/socket combination at J2. This header/socket provides access to the digital control and serial data
pins from both J2A (top side) and J2B (bottom side) of the connector. Consult Samtec at
http://www.samtec.com
Table 2
describes the serial interface pins.
Pin No.
J2.1
J2.2
J2.3 J2.5
J2.4
J2.6
J2.7 J2.9
J2.8
J2.10
J2.11
J2.12
J2.13
J2.14
J2.15
J2.16
J2.17
J2.18
J2.19
J2.20
(1)
Group A contains V
The SCLK signal and the CS signal can each be controlled by two different pins on J2. Pins J2.3 and J2.5
have been shorted together, as well as pins J2.7 and J2.9.
Pins J2.8, J2.12, J2.14, J2.15, and J2.17 have weak pull-up/pulldown resistors. These resistors provide
default settings for many of the control pins. J2.3, J2.5, J2.7, J2.9, J2.11 correspond directly to DAC7716
pins. See the
DAC7716 product data sheet
Control signals to and from the DAC7716 can be accessed through the digital interface, or switches and
jumpers found directly on the EVM. The /LDAC, Uni/Bip A, Uni/Bip B, and RST signals are initially pulled
high through 10kΩ resistors and can be controlled by switch S1 or through J2.
The load DAC (LDAC) pin is connected via jumper JP1 to either the J2.15 or J2.17 pin. Updating the DAC
registers can be completed in two different ways. LDAC can either be tied to ground, in which case the
input registers are immediately updated, or LDAC can be pulled high. Therefore, the DAC registers update
when LDAC is taken low. Switch S1.1 can be closed to hold the LDAC low. See the DAC7716 data sheet
for more information on updating the DAC.
4
DAC7716EVM
or call 1-800-SAMTEC-9 for a variety of mating connector options.
Table 2. J2: Serial Interface Pins
Signal Name
I/O Type
Unused
—
GPIO-0
In/Out
SCLK
In
DGND
In/Out
GPIO-1
In/Out
CS
In
Uni/Bip A
In
DGND
In/Out
SDO/SDI
In/Out
Uni/Bip B
In
Unused
—
RST
In
LDAC
In
Unused
—
LDAC
In
DGND
In/Out
Unused
—
Unused
—
-0 and V
-1. Group B contains V
OUT
OUT
for complete details on these pins.
Copyright © 2009, Texas Instruments Incorporated
(1)
Pullup
Function
—
High
GPIO-0
None
DAC7716 SPI
clock; pins are
shorted together
None
Digital ground
High
GPIO-1
None
SPI bus chip select;
pins are shorted
together
High
Output mode select
of Group A
None
Digital ground
None
DAC7716 SPI data
in/out
High
Output mode select
of Group B
—
High
Input register reset
High
GPIO signal to
control LDAC for
DAC output latch
update
—
High
Alternate GPIO
signal to control
LDAC for DAC
output latch update
None
Digital ground
—
—
-2 and V
-3.
OUT
OUT
Submit Documentation Feedback
www.ti.com
SBAU159 – October 2009
Need help?
Do you have a question about the DAC7716EVM and is the answer not in the manual?