Texas Instruments DAC7568EVM User Manual
Texas Instruments DAC7568EVM User Manual

Texas Instruments DAC7568EVM User Manual

Dacxx68evm series

Advertisement

Quick Links

The DACxx68 Evaluation Module is an evaluation board containing all the necessary components to
evaluate the eight-channel DAC7568, DAC8168, or DAC8568 series of high-performance digital-to-analog
converters from Texas Instruments. The EVM is designed so that a single printed-circuit board (PCB)
supports the entire family of high-speed, 12- to 16-bit serial DACs. The EVM is provided with Grade C
devices which reset to zero and have a full-scale output range of 0 V to 5 V.
The modular EVM form factor allows for direct evaluation of the DAC's performance and operating
characteristics. This EVM is compatible with the 5-6K Interface Board (SLAU104) from Texas Instruments
as well as the HPA-MCU Interface Board (SLAU106).
1
2
3
4
4.1
4.2
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
6
6.1
6.2
7
1
1
2
3
4
Bill of Materials
SLAU301 - November 2009
Submit Documentation Feedback
...............................................................................................................
.............................................................................................................
..............................................................................................................
..............................................................................................................
.........................................................................................................
............................................................................................
..............................................................................................................
......................................................................................................
...................................................................................................
......................................................................................................
................................................................................................................
................................................................................................
......................................................................................................
.........................................................................................
......................................................................................
.....................................................................................................
....................................................................................................
...............................................................................................................
..............................................................................................................
.............................................................................................
..............................................................................................................
Copyright © 2009, Texas Instruments Incorporated
Contents
.......................................................................
List of Figures
..................................................................
List of Tables
User's Guide
SLAU301 - November 2009
DACxx68EVM
2
2
2
3
3
3
3
3
4
4
4
4
5
5
6
6
7
8
5
2
3
5
6
DACxx68EVM
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAC7568EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments DAC7568EVM

  • Page 1: Table Of Contents

    DAC7568, DAC8168, or DAC8568 series of high-performance digital-to-analog converters from Texas Instruments. The EVM is designed so that a single printed-circuit board (PCB) supports the entire family of high-speed, 12- to 16-bit serial DACs. The EVM is provided with Grade C devices which reset to zero and have a full-scale output range of 0 V to 5 V.
  • Page 2: Evm Overview

    External source for LOAD DAC (LDAC) strobe via JP6 J2.17 TOUT Default source for LOAD DAC (LDAC) strobe via JP6 J2.19 GPIO5 Optional source for active low CLEAR (CLR) input DACxx68EVM SLAU301 – November 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 3: Power Supplies

    The analog output from the EVM is applied directly to J2 (top or bottom side) pins 2-16 (even). The DACxx68EVM does not provide any additional filtering or buffering of the output voltage, so that the user may evaluate the converter’s low-glitch output performance. SLAU301 – November 2009 DACxx68EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 4: Reference In/Out

    EVM is to place a shunt jumper between pins 1-2 of JP6. This allows the Timer Output (TOUT) signal from DSP host systems to be used as the LDAC input to the DAC. This signal originates from J1.17. DACxx68EVM SLAU301 – November 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 5: Clear (Clr)

    The following diagram provides an overview of the DACxx68 assembly and locations of the various jumpers and connectors. Figure 1. Top Layer Assembly Drawing and Jumper Locations SLAU301 – November 2009 DACxx68EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 6: Bill Of Material And Evm Schematic

    The device installed at location U1 is dependent on the EVM ordered. This device is soldered to the board for best performance. U1 may be replaced with any device listed in the EVM Compatible Device Data Sheets table found at the beginning of this document. DACxx68EVM SLAU301 – November 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 7: Evm Schematic

    Bill of Material and EVM Schematic www.ti.com EVM Schematic SLAU301 – November 2009 DACxx68EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 8: Related Documentation From Texas Instruments

    DAC7568, DAC8168, DAC8568, 12-/14-/16-Bit, Octal-Channel, Ultra-Low Glitch, Voltage Output Digital-to-Analog Converters With 2.5V, 2ppm/°C Internal Reference data sheet (SBAS430) blank paragraph to eliminate last blank page DACxx68EVM SLAU301 – November 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 9 Evaluation Board/Kit Important Notice Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 10: Important Notice

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.
  • Page 11 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments DAC7568EVM DAC8168EVM DAC8568EVM...

This manual is also suitable for:

Dac8168evmDac8568evm

Table of Contents