Advertisement

Quick Links

This user's guide describes the characteristics, operation, and use of the DAC7716EVM. The evaluation
module (EVM) is an evaluation board that allows for quick and easy evaluation of the DAC7716. The
DAC7716 is a quad, high-accuracy, 12-bit R-2-R digital-to-analog converter (DAC). The device features
low-power operation, good linearity, and the ability to use different reference voltages for the output
channels. This EVM allows evaluation of all aspects of the DAC7716. Complete circuit descriptions,
schematic diagrams, and bill of material are included in this document.
The following related documents are available through the Texas Instruments web site at
http://www.ti.com.
All trademarks are the property of their respective owners.
SBAU159 – October 2009
Submit Documentation Feedback
DAC7716EVM
EVM-Compatible Device Data Sheets
Device
DAC7716
REF5025
REF5050
OPA211
TL750L08
Copyright © 2009, Texas Instruments Incorporated
DAC7716EVM
Literature Number
SBAS463
SBOS410
SBOS410
SBOS377
SLVS017
User's Guide
SBAU159 – October 2009
1
DAC7716EVM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAC7716EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments DAC7716EVM

  • Page 1 This EVM allows evaluation of all aspects of the DAC7716. Complete circuit descriptions, schematic diagrams, and bill of material are included in this document. The following related documents are available through the Texas Instruments web site at http://www.ti.com. EVM-Compatible Device Data Sheets...
  • Page 2: Table Of Contents

    DAC8734, the 16-bit version of the DAC7716. The DAC7716 is installed in place of the DAC8734 on the DAC7716 evaluation module. DAC7716EVM SBAU159 – October 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 3: Analog Interface

    Reference Voltage section for more information. Digital Interface The DAC7716EVM is a serial input data converter. The evaluation module is designed for interfacing to multiple control platforms. SBAU159 – October 2009 DAC7716EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 4: J2: Serial Interface Pins

    LDAC is taken low. Switch S1.1 can be closed to hold the LDAC low. See the DAC7716 data sheet for more information on updating the DAC. DAC7716EVM SBAU159 – October 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 5: Power Supplies

    RefGND-A/RefGND-B to have more than a 0.3V difference from the board AGND on the DAC. A jumper across pins 2 and 3 on JP6 and JP7 connects the RefGND-A and RefGND-B to the ground of the board. SBAU159 – October 2009 DAC7716EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 6: Evm Operation

    No specific evaluation software is provided with this EVM; however, various code examples are available that show how to use EVMs with a variety of digital signal processors from Texas Instruments. Check the respective product folders or send an e-mail to dataconvapps@list.ti.com...
  • Page 7: Dac7716Evm Default Jumper Locations

    Jumper JP9 is not installed. If the user desires to disconnect RFB1 from V , the trace between JP9 OUT1 must be cut. JP9 can then be installed. SBAU159 – October 2009 DAC7716EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 8: Schematics And Layout

    Hazardous Substances (RoHS) Directive. Some part numbers may be either leaded or RoHS. Verify that purchased components are RoHS-compliant. (For more information about TI's position on RoHS compliance, see the TI web site.) DAC7716EVM SBAU159 – October 2009 Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 9: Dac7716Evm Bill Of Materials

    Manufacturer and part number for items may be substituted with electrically equivalent items. J3B parts are not shown in the schematic diagram. J3B is installed on the bottom side of the PWB opposite to J3A. SBAU159 – October 2009 DAC7716EVM Submit Documentation Feedback Copyright © 2009, Texas Instruments Incorporated...
  • Page 10 PRECISION ANALOG PRODUCTS...
  • Page 11 Evaluation Board/Kit Important Notice Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 12: Important Notice

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.

Table of Contents