9.3 Oil hook path

10. Putting into operation

10.1 Standard delivery

2
1
Oil hook path
Open hook cover.
Give a drop of oil between driver 2 and path 1.
Shut hook cover.
ATTENTION !
When assembling the machine and after a longer stop the hook path
and the connecting rod have to be oiled.
Caution: Danger of injury !
Switch off main switch.
Oil automatic bartacker only when switched off.
The automatic bartackers are delivered with the following clamping
feet:
Class 510-211
Class 510-212
Class 510-213
ATTENTION Risk of breakage !
If the standard clamping foot is changed, the corresponding clamping
foot number has to be entered.
with clamping foot No. 1
with clamping foot No. 8
with clamping foot No. 2