Oil Hook Path; Putting Into Operation; Standard Delivery - Duerkopp Adler 530 Installation Instructions Manual

Cnc automat for button sewing
Hide thumbs Also See for 530:
Table of Contents

Advertisement

8.3 Oil hook path

9. Putting into operation

9.1 Standard delivery

2
1
Oil hook path
Open hook cover.
Give a drop of oil between driver 2 and path 1.
Shut hook cover.
ATTENTION !
When assembling the machine and after a longer stop the
hook path and the connecting rod have to be oiled.
Caution: Danger of injury !
Switch off main switch.
Oil button sewing automat only when switched off.
The button sewing automat is delivered with a standard clamping foot.
ATTENTION Risk of breakage !
If the standard clamping foot is changed, the corresponding
clamping foot number has to be entered.
2
21

Advertisement

Table of Contents
loading

Table of Contents