Avaya PARTNER Quick Reference Manual page 25

Advanced communications system
Hide thumbs Also See for PARTNER:
Table of Contents

Advertisement

Quick Reference Guide
If this is the initial installation for a Release 3.0 system, follow these
7
additional steps:
Check the LEDs to make sure that the processor is on steady green for
a
at least 15 seconds.
f00ss#989
Press
b
or 11.
25327
Press
c
The system resets. You may proceed with the rest of the installation upon
completion of the reset (about 20 seconds).
If your system has a 1600 DSL module, initialization of the line
and extension ports may take up to 40 seconds. The
initialization of the 1600 DSL module itself may take from 2 to 7
minutes.
Checking the LEDs
After you power up your system, check the green lights on the fronts of the
modules:
• If a single light is out, power down the control unit, reseat the module, and
then power up the carrier.
• If multiple lights are out, power down the carrier, reseat either both modules
(2-slot carrier) or the leftmost module that has a light out (5-slot carrier),
and then power up the carrier.
If the lights are still out, see the "Customer Support Document" on the
accompanying compact disc for information about whom you should contact.
.
2 Installing Your System
at extension 10
Installing the Control Unit
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents