Evaluating The Environment; Installing The Control Unit - Avaya PARTNER Quick Reference Manual

Advanced communications system
Hide thumbs Also See for PARTNER:
Table of Contents

Advertisement

2 Installing Your System

Evaluating the Environment

Before you begin the physical installation of the system, you must check that all
environmental factors are within the acceptable ranges. See the PARTNER
Advanced Communications System Installation, Programming, and Use guide
for more details.

Installing the Control Unit

The stand-alone processor module or a carrier and its modules are referred to as
the control unit. The control unit must always be wall-mounted.
WARNING :
There are no customer-serviceable components inside the system modules
or carrier. There are hazardous voltages within that can cause severe or
fatal personal injury. DO NOT OPEN MODULES.
To install the control unit, you must do the following:
• Wall-mount the control unit.
• Label the jacks.
• Ground the system.
• Insert the batteries into the processor module.
• Initialize the system.
• Check the LEDs on the modules.
• Install the cover (5-slot carrier only on a system of Release 3.0 or earlier).
Wall-Mounting a Stand-Alone Processor Module and a 2-Slot
Carrier
Install the processor module within 5 feet (1.5 meters) of a properly grounded
wall outlet (not controlled by a switch) and the network interface jacks.
8
Evaluating the Environment
Quick Reference Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents