Server Board Installation And Upgrading; Tools And Supplies Needed; Before You Begin; Emissions Disclaimer - Intel S845WD11U Product Manual

Product guide
Table of Contents

Advertisement

2 Server Board Installation and Upgrading

Tools and Supplies Needed

Phillips
(cross head) screwdriver (#1 bit and #2 bit)
Jumper removal tool or needle nosed pliers
Pen or pencil
Antistatic wrist strap and conductive foam pad (recommended)

Before You Begin

Emissions Disclaimer

To ensure EMC compliance with your local regional rules and regulations, the final configuration
of your end system product may require additional EMC compliance testing. For more information
please contact your local Intel Representative.
See "Regulatory and Integration Information" on page 93 for product Safety and EMC regulatory
compliance information. This is an FCC Class A device. Integration of it into a Class B chassis
does not result in a Class B device.

Warnings and Cautions

These warnings and cautions apply throughout this chapter. Only a technically qualified person
should configure the server board.
WARNING
Hazardous conditions, devices & cables: Hazardous electrical
conditions may be present on power, telephone, and communication cables.
Turn off the server and disconnect the power cord, telecommunications
systems, networks, and modems attached to the server before opening it.
Otherwise, personal injury or equipment damage can result.
CAUTIONS
System power on/off: The power button DOES NOT turn off the system
AC power. To remove power from system, you must unplug the AC power
cord from the wall outlet. Make sure the AC power cord is unplugged before
you open the chassis, add, or remove any components.
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S845wd1-e

Table of Contents