Table 22 Floor load rating and required clearances for a six rack configuration (continued)
Floor Load
Rating
(kg/m2)
400
350
300
Notes:
1. Actual clearances for installation should be determined after consulting with construction specialist responsible for
installation building, as they could vary depending on the size/layout of the system and building conditions.
2. When various configurations of disk arrays are arranged in a row, clearance values based on the largest disk array
configuration should be used.
3. From the viewpoint of maintenance operations, it is suggested that Clearance (c) be made as large as possible.

Operational requirements

The operational requirements for the P9500 include:
LAN for Remote Web Console
Remote Web Console communicates with the P9500 disk array over a LAN to obtain system
configuration and status information and send user-requested commands to the disk array. Remote
Web Console serves as the integrated interface for all Resource Manager components.
Cable length for channel adapters
Table 23 (page 40)
Table 23 Maximum cable length (shortwave)
Data Transfer Rate
100 MB/s
200 MB/s
400 MB/s
800 MB/s
10 GB/s (FCoE)
External data storage
If you plan to attach external storage to the P9500 disk array, be sure to include the appropriate
power and space requirements in your planning.
40
Installation requirements
Required Clearance (a+b) m
Clearance (c) m
C=0
C=0.2
1.5
1.1
2.6
2.2
4.4
3.8
lists the cable length requirements for the CHAs in the P9500 disk array.
OM1(62.5/125ƒÝm
multi-modefiber)
300 m
150 m
70 m
21 m
33 m
C=0.4
C=0.6
0.8
0.5
1.8
1.4
3.3
2.9
OM2(50/125ƒÝm
multi-modefiber)
500 m
300 m
150 m
50 m
82 m
C=0.6
0 .1
0.9
2.1
OM3(50/125ƒÝm laser
optimized multi-mode fiber)
500 m
500 m
380 m
150 m
300 m

Advertisement